Call Office #
770-578-8458
Call Office #
770-578-8458
SCHEDULE NOW
SCHEDULE NOW
Home
Services
Projects
Reviews
Contact
Repair
Remodeling
Maintenance
Electronic Installation
Repair
Maintenance
Electronic Installation
Welcome to my
Remodeling
Section
Kitchen 1 Design - The Planning Stage
Kitchen 1 - The Layout
Kitchen 1 - Before
Kitchen 1 Installed Crown Trim
After - Kitchen 1 Cabinets, LED Lighting, New Appliance's, Black Granite Counter Top. Floors installed at a later Date.
Kitchen 1 Finished
Old Kitchen 2 - Before
Kitchen 2 I made Cabinet Doors and Drawers, Countertop getting measured for Granite
Granite installed, I Tiled Backsplash using 4x4, 1/2x1/2 to pull out Granite colors, 3x6 Subway, 6x6 for Medallion
Close up of Farm House Sink
Kitchen 2 Built Cabinet on Floor
Kitchen 2 Installed Beadboard on Walls and two Refrigerator Fronts
Kitchen 2 Installed Wood Flooring
Kitchen 2 Done!
Kitchen 3 Design - The Planning Stage
Kitchen 3 Installing the Cabinets
Kitchen 3 Customer Gutted, Installed Flooring and Backsplash, I installed the Cabinets and Trim
Kitchen 4 Makeover Project Before
Kitchen 4 Tiled Backsplash
Kitchen 4 Removed Old Slider Door
Kitchen 4 Installed New Out Swing French Door
Kitchen 4 Removed 2nd layer of Linoleum down to 1st layer, ready to install LVP Flooring
Kitchen 4 Installing LVP Flooring
Converting Laundry Room to Mudroom, 1/2 Bathroom and Laundry
Mudroom Done
1/2 Bath done with BeadBoard Ceiling and Shaker Style Cabinet
Big Mirror to Remove
All done with the Mirror Project
The Kitchen Island Makeover
Island Makeover Done
Customer would like Dresser in Closet
55" Flat Screen TV, Sonos Sound Bar and built in Dresser
The Design - Wrapping Station in Closet
Starting the Project getting the Layout
Decorating Station Complete
Getting ready to remove the Old Tile
Other side of Kitchen
Installed Tile, This Project in now Finished
The Kitchen Makeover Customer is working on the Cabinets. I am getting the Backsplash ready for Drywall
This side of Kitchen Done
Removed Backsplash down to Studs
Tiling complete this Project is Done. Customer to finish Cabinets at a later Date
Bathroom 1 & 2 Tile Floor Project
Bathroom 1 Removed Vinyl Flooring to Installed 12"x12" Tile
Bathroom 2
Tile work done
Bathroom Makeover Floor Tile, new Vanity and Toilet
Bathroom Done Customer to install Floor Trim
Getting started removed Laminate Backsplash
Working on the Medallion
This Project is Finished
Ready for new Tile Backsplash
This section complete
Bathroom getting a Update
Installed new Vanity, Faucet, Mirror and Wall Sconces
view more projects→
Quick links
Home
|
Services
|
Projects
|
Reviews
|
Contact
Hours
Monday – Friday 8:00am – 6:30pm
Company Information
Greg Steuer
Office #: 770.578.8458
Greg’s Handyman Services
License and Insured
EAST COBB WEATHER
You can also find us here:
Quick links
Home
|
Services
|
Projects
|
Reviews
|
Contact
Hours
Monday – Friday 8:00am – 6:30pm
Company Information
Greg Steuer
Office #: 770.578.8458
Greg’s Handyman Services
License and Insured
You can also find us here:
EAST COBB WEATHER